PreussenElektra GmbH commissioned Dornier Hinneburg GmbH to draw up packaging schedules, qualification concepts and waste container documentation, and to carry out the associated packaging planning for approximately 3,900 waste drums at the Mitterteich interim storage facility.
Our services at a glance:
Review of existing data and development of concepts:
- Review and evaluation of all existing records and documentation
- Development of overarching concepts for the material declaration of waste
- Review of radiological data and development of overarching concepts for radiological calculation
Development of packaging schedules and campaign documentation (completed)
- Process plans for packaging the drums in Konrad containers
- Qualification concepts for achieving the required waste product quality
- Campaign concept
Creation of packaging concepts in call-off batches (in progress)
- Compilation of waste drums taking into account radiological data and logistical constraints at the Mitterteich interim storage facility
- Selection of repository containers taking into account permissible total values, guaranteed values and transport conditions
Waste container documentation
- Preparation of repository documentation for the entire waste inventory and AVK* data maintenance
*AVK = Abfallfluss-Verfolgungs- und Produktkontroll-System (Waste flow tracking and product control system)