Documentation on building clearance at the Stade nuclear power plant

PreussenElektraGmbH commissioned Dornier Nuclear Services with a project for the preparation of the documentation, which is a fundamental prerequisite both for the clearance and for the handover of buildings and grounds in the monitoring area of the Stade Nuclear Power Plant (KKS). The documentation meets the requirements set out in Section 7(3) of the German Atomic Energy Act (AtG) and the corresponding requirements set out in the Radiation Protection Ordinance (StrSchV) and in DIN 25457. The requirements set out by the Ministry of the Environment in the KKS-specific approval notice are satisfied in the documentation.

The documentation created by Dornier Nuclear Services enables PreussenElektra to efficiently apply to the authorities for demolition of the building and site release. It thus makes an important contribution to the further dismantling of the KKS.

 

Our services at a glance:

  • Preparation of a handover programme as a concept for a general approach
  • Surveying of the operating history of buildings in the monitoring area of the KKS, followed by a plausibility analysis
  • Stocktaking of mobile and stationary facilities
  • Preparation of the associated measurement and sampling program for the interior of the buildings and the building envelopes, delimitation of potential accumulation points
  • Coordination of interfaces with adjacent decommissioning activities