Westinghouse GmbH was commissioned to dismantle, condition and package the core components, reactor pressure vessels and fuel storage racks at the Gundremmingen II nuclear power plant (Blocks B & C). Westinghouse commissioned Dornier Hinneburg GmbH to prepare the campaign documentation, determine the activity levels and prepare the waste container documentation.
Preparation of campaign documentation
Determination of activity levels for repository containers (Konrad containers and MOSAIK-II)
Waste container documentation and AVK data maintenance (since 10/2024)
*AVK = Abfallfluss-Verfolgungs- und Produktkontroll-System (Waste flow tracking and product control system)