Dismantling of the core components, the RPV and the fuel storage racks at the Gundremmingen II nuclear power plant (Blocks B/C)

Details
Customer
Westinghouse Electric Germany GmbH (on behalf of RWE Nuclear GmbH)
Country
Germany
Location
Gundremmingen II Nuclear Power Plant
Duration
since 05/2022
Topics

Dismantling of the core components, the RPV and the fuel storage racks at the Gundremmingen II nuclear power plant (Blocks B/C)

Westinghouse GmbH was commissioned to dismantle, condition and package the core components, reactor pressure vessels and fuel storage racks at the Gundremmingen II nuclear power plant (Blocks B & C). Westinghouse commissioned Dornier Hinneburg GmbH to prepare the campaign documentation, determine the activity levels and prepare the waste container documentation.

 

Our services at a glance:

Preparation of campaign documentation

  • Schedule plans
  • Campaign concepts including material descriptions
  • Concepts for determining activity levels
  • Reports on reference containers
  • Sampling and measurement concepts
  • Participation in expert discussions

Determination of activity levels for repository containers (Konrad containers and MOSAIK-II)

  • Activity determination as part of cutting and packaging planning
  • Activity determination as part of operational documentation based on activation calculations and analysis results

Waste container documentation and AVK data maintenance (since 10/2024)

  • Compilation of all documents and evidence relevant to final disposal, entry of AVK data for waste containers and creation of waste container documentation

    *AVK = Abfallfluss-Verfolgungs- und Produktkontroll-System (Waste flow tracking and product control system)

Weitere Referenzen

Mehr laden